Milica Srećković str. No. 26 - Kragujevac, Serbia
  +381 34 206549      kontakt@idestgroup.com
     

Reconstruction of the heating system in the chrome-plating tubs in Building 36 - Galvanization

 2019.

eng ind instal

Brief description: Reconstruction of the heating system in the chrome-plating tubs in Building 36 - Galvanization within the Zastava Oruzje complex. The whole process was controlled via a logic controller that received temperature information from a Pt100 probe immersed in the solution.

Investor: Zastava Oruzje a.d.

Year: 2019

Location: Kragujevac, Serbia

Phases: IDP - Preliminary design of mechanical installations