Milica Srećković str. No. 26 - Kragujevac, Serbia
  +381 34 206549      kontakt@idestgroup.com
     

Consulting



Investment estimation

Preliminary investment estimation (both green- and brownfield) with basic information on property ownership, property category, mandatory procedures and preliminary Bill of Quantities, based on general Technology requests.

This service includes up to two field visits to the location (on territory of Republic of Serbia), production of internal Report and delivery to the Investor.

Experience in brownfield planning is of most valuable importance as it secures efficient usage of funds, pending on specific technical requests and condition of the facility.

Idest is experience in planned savings in the production process. By introducing flow meters on strategic points and using software support the Investor is able to regulate energy consumption and gain significant savings.

This activity, along with recommendable energy efficiency for the facility guarantees long-term savings and better business.

Idest doo holds valid licence for issuing Energy passports.

Harmonization of standards

In case of external investments usage of different standards presents specific challenge (e.g. technology equipment is produced according to the standards of the country of origin/investment). Idest gained experience in harmonization of standards sometimes including re-certification and re-attesting at national institution.

Early engagement prevents additional works and costs. This specially relates to technology processes, distribution and storage of gasses and industrial liquids where additional costs are high.